
Remediation
Aarhus 4-12R1-1
Sherwood · July 2026
3,745 tons removed
24/7 spill response across North Dakota
(701) 838-7599Contaminated material removed and the site returned to farmland.

Completed borings to assist environmental consultants with a site investigation, collecting samples for logging and laboratory analysis. Completed excavation and disposal of contaminated material, installed a geomembrane liner, backfilled clay and topsoil, ripped the site to reduce compaction, and completed seeding.


Tell us where the site is and what happened. We'll walk it with you and put a bid together.