MRPSU 36-21 North

Contaminated material removed and the site returned to farmland.

Location
Mohall, North Dakota
Completed
June 2025
Aerial view of the geomembrane liner being covered at MRPSU 36-21 North.

Completed borings to assist environmental consultants with a site investigation, collecting samples for logging and laboratory analysis. Completed excavation and disposal of contaminated material, installed a geomembrane liner, backfilled clay and topsoil, ripped the site to reduce compaction, and completed seeding.

Project detail

Client and owner
Terracon and North Dakota Natural Resource Trust
Scope of work
Soil exploration, soil removal, soil replacement and reclamation
Key activities and methods
Drilling, Excavation, Dozer handling, Lining, Backfilling, and Seeding
Well sites
1
  • Aerial view of the excavation at MRPSU 36-21 North, cut into flowering canola.
  • An excavator loads out material at MRPSU 36-21 North.