Susan Anderson 1

Contaminated material removed and the site returned to farmland.

Tons of contaminated material removed
883
Location
Grano, North Dakota
Completed
August 2026
An excavator works beside lined containment at Susan Anderson 1 near Grano.

Completed borings to assist environmental consultants with a site investigation, collecting samples for logging and laboratory analysis. Completed excavation and disposal of contaminated material, installed a geomembrane liner, backfilled clay and topsoil, ripped the site to reduce compaction, and completed seeding.

Project detail

Client and owner
Terracon and NDIC Oil & Gas Division
Funding
Federal IIJA
Scope of work
Soil exploration, soil removal, soil replacement and reclamation
Key activities and methods
Drilling, Excavation, Dozer handling, Lining, Backfilling, and Seeding
Well sites
1
  • A dozer spreads backfill across the excavation at Susan Anderson 1.
  • A tractor works the restored ground at Susan Anderson 1 ahead of seeding.