Skip to content

24/7 spill response

(701) 838-7599

Tioga soccer complex

Rolling terrain converted into a full soccer complex with drainage, graded with GPS machine control.

Location
Tioga, North Dakota
Completed
July 2026
Two dozers cut the playing field to grade at the Tioga soccer complex.

Converted rolling hills into a soccer complex including the field itself, drainage areas, final cut slopes and road access. The work involved stripping topsoil, cutting and filling to engineering specification using our Topcon GPS machine-control system, compacting soils, installing drainage grades and road access, and replacing topsoil across the future field area.

Project detail

Client and owner
City of Tioga
Scope of work
GPS-controlled cut and fill, soil levelling, drainage and road grade
Key activities and methods
Dozer levelling, Topsoil placement, Grading, and Compacting
  • Aerial view of the Tioga soccer complex under construction, the town behind it.
  • A dozer moves topsoil at the Tioga soccer complex.

Have ground that needs to come back?

Tell us where the site is and what happened. We'll walk it with you and put a bid together.