Site reclaims & seeding

Topsoil restoration and precision seeding at twice the standard rate.

Before: bare, excavated ground around a cow pond, seen from the air. After: the same area grown back to grassland.BeforeAfter
Cow pond reclamation, before and after.

The last layer is the one people see. We replace topsoil to depth and seed at twice the standard rate, so vegetation takes hold and the land performs the way it was supposed to.

What's included

  • Topsoil replacement
  • Seeding at 2x rate
  • Erosion control
  • Follow-up site maintenance

Recent work

  • Reclamation

    NDIC 2021 Bid Package #5

    Lando–Antler area
    Fall 2021

    Eleven well sites reclaimed to farmland.

    Client
    State of North Dakota and NDIC Oil & Gas Division

    7,964

    tons removed

  • Reclamation

    Tioga Tree Pit reclamation

    Tioga
    May 2025

    A worked-out sand and gravel pit recontoured to the original topography and seeded back to vegetation.

    Client
    Terracon and North Dakota Natural Resource Trust
  • Remediation

    Grengs #1R3-8

    Sherwood
    September 2026

    Contaminated material removed and the site returned to farmland.

    Client
    Terracon and NDIC Oil & Gas Division
    Funding
    Federal IIJA
  • Remediation

    MRPSU 36-21 North

    Mohall
    June 2025

    Contaminated material removed and the site returned to farmland.

    Client
    Terracon and North Dakota Natural Resource Trust

Also in reclamation

Have ground that needs to come back?

Tell us where the site is and what happened. We'll walk it with you and put a bid together.